March 18, 2026

Intel Clearwater Forest Xeon 6+: 288 Cores on 18A Process with Foveros Direct 3D — Inside Intel’s Make-or-Break Server CPU

One socket. 288 cores. 38% less power than the dual-socket system it replaces. Intel just dropped the most significant server CPU in years at MWC 2026 […]
October 14, 2025

Intel Core Ultra 300 Panther Lake Unveiled: 18A Process, Xe3 GPU, and 5 Reasons Arrow Lake’s Successor Changes Everything

Intel just mass-produced a chip on a process node that doesn’t even exist at TSMC or Samsung yet — and it’s coming to laptops before the […]
September 12, 2025

Intel Core Ultra 300 Desktop Preview: Nova Lake on 18A Process, LGA 1954 Socket, and Why Arrow Lake Builders Should Wait

Intel just admitted what every PC builder has been whispering for months: there are “holes to fill on the desktop front.” At this week’s Goldman Sachs […]